Skip to content

How to copy Lessons from a Bank

You can copy or link lessons from your own bank, from a shared bank, of from a school/district bank. To copy or link lessons from a lesson bank:

  1. From the Plans page, click the Copy icon in top-right menu.

Copy From (Left Side):


  1. Select Lessons in the Type dropdown.


  2. Select the bank to copy from in the Bank dropdown.


  3. If desired, select a unit to copy from in the Unit dropdown.


  4. Enter a Start Pos and End Pos for the lessons to copy, or leave blank for all lessons.


  5. If desired, click the Show button to view the lessons to copy.

Copy To (Right Side):


  1. Select the class to copy the lessons to in the Class dropdown.


  2. Select Where to place lessons:

    • AFTER Existing Lessons - Lessons will be inserted after all existing lessons in the class.


    • INSERT Starting At - Enter an Insert Date, and lessons will be inserted starting on the date. Any existing lessons will be shifted accordingly.


  3. Select to copy or link the lessons:

    • Copy Lessons - Lessons will be copied to your class. Changes made to source lessons will not show in the copied lessons.


    • Link Lessons - Lessons will be linked to your class. Changes made to source lessons will show in the linked lessons.



Feedback and Knowledge Base